 

Global Construction

FC-01x Future Cities (1st Run) - Task 1

Uploaded on 2014-12-09 by saavento

[1]: https://edxuploads.s3.amazonaws.com/1418158770719927.jpg This bridge was prefabricated in modules and assembled on site. The arc, pillars, white concrete, steel. All was imported on site meeting specifications from the constructor.